Production Targets¶
As noted in the offline keys documentation, production devices receive a slightly different copy of the TUF targets metadata. This production copy must be signed with both the Foundries.io targets signing key and the Factory’s offline targets signing key.
Production targets are managed by using Waves. Normally, when the TUF targets metadata is updated, all devices see it and can start updating themselves. Waves are a feature that allow Factory operators to control the rate at which devices see a new copy of the TUF targets metadata.
Before a Factory can start doing production OTAs, an initial production Targets file must be created. This can be done by creating a dummy wave like:
# fioctl wave init <wave-name> <target number> <tag>
fioctl wave init -k /absolute/path/to/targets.only.key.tgz populate-targets 12 production
fioctl wave complete populate-targets
This creates a new targets.json
file for production devices subscribing
to the production
tag. It will include a single Target from CI
build. In this example, build 12.
Performing a production OTA¶
Continuing from the example above. A Factory may go through some development work and have a new CI build #42 that’s ready to be run in production. A wave can be initialized with:
fioctl wave init -k /absolute/path/to/targets.only.key.tgz v2.0-update 42 production
Note
Operators will want to generate OSTree static deltas before rolling out waves to devices.
A new wave is ready to share with device groups. A Factory might have a device group called “canary”. Those devices can be moved to this new update with:
fioctl waves rollout v2.0-update canary
At this point, an operator can monitor the status of the OTA via
fioctl status
. If the update goes badly they can cancel the wave
with:
fioctl waves cancel v2.0-update
The devices that were successfully updated to Target 42 will continue to
run it. However, all other production devices on the production
tag
will continue to run Target 12.
Assuming the first wave to the canary
device-group succeeded, an
operator can roll out to more devices. For example a device-group named
us-east-1
:
fioctl waves rollout v2.0-update us-east-1
Eventually the operator can update the primary targets.json
file for all
devices on the production
tag with:
fioctl waves complete v2.0-update
Note
When flashing new production devices, it is recommended to only use promoted production targets.