Production Targets

As noted in the offline keys documentation, production devices receive a slightly different copy of the TUF targets metadata. This production copy must be signed with both the Foundries.io targets signing key and the Factory’s offline targets signing key.

Production targets are managed by using Waves. Normally, when the TUF targets metadata is updated, all devices see it and can start updating themselves. Waves are a feature that allow Factory operators to control the rate at which devices see a new copy of the TUF targets metadata.

Before a Factory can start doing production OTAs, an initial production Targets file must be created. This can be done by creating a dummy wave like:

# fioctl wave init <wave-name> <target number> <tag>
fioctl wave init -k /absolute/path/to/targets.only.key.tgz populate-targets 12 production
fioctl wave  complete populate-targets

This creates a new targets.json file for production devices subscribing to the production tag. It will include a single Target from CI build. In this example, build 12.

Performing a production OTA

Continuing from the example above. A Factory may go through some development work and have a new CI build #42 that’s ready to be run in production. A wave can be initialized with:

fioctl wave init -k /absolute/path/to/targets.only.key.tgz v2.0-update 42 production

Note

Operators will want to generate OSTree static deltas before rolling out waves to devices.

A new wave is ready to share with device groups. A Factory might have a device group called “canary”. Those devices can be moved to this new update with:

fioctl waves rollout v2.0-update canary

At this point, an operator can monitor the status of the OTA via fioctl status. If the update goes badly they can cancel the wave with:

fioctl waves cancel v2.0-update

The devices that were successfully updated to Target 42 will continue to run it. However, all other production devices on the production tag will continue to run Target 12.

Assuming the first wave to the canary device-group succeeded, an operator can roll out to more devices. For example a device-group named us-east-1:

fioctl waves rollout v2.0-update us-east-1

Eventually the operator can update the primary targets.json file for all devices on the production tag with:

fioctl waves complete v2.0-update